Ecuador

Integrated Planning of the Bicycle Infrastructure Network for the Municipality of La Paz Phase I


Implemented by

AFD horizontal footer

Objective

Create the bicycle infrastructure network for the municipality of La Paz and propose an intermodal connection, which promotes the use of bicycles in urban mobility, through the design and construction of a bicycle path in the Southern Macro District

Challenges in the region

  • In La Paz, less than a thousand trips are made daily by bicycle, which represents 0.04% of the modal split
  • Due to health contingencies, the construction of emerging bicycle lanes has begun, but there is still no permanent cycling infrastructure
  • In the city's Southern Macro District there are Sunday bike rides, which will help boost usage with the construction of the cycle path

Location

La Paz, Bolivia

 

Project

Pilot project

 

Overall Project Amount


0
Euros

Implementation period

2018  -   2020

Project phases

1

Initiation

Report on the design and budget for the cycle path
2

Preparation

Preparation of bid tender documents for the works
3

Diagnostic

Study tour report for SMM staff, report on site supervision support
4

Preparation

Design of the public bicycle system for the city of La Paz. Support in the design of the communication campaign for the launch of the bicycle infrastructure
4

Implementation

Construction of Phase I of the cycling path

Expected results

1

Support

To the SMM team and the Communication Department for the design of the communication campaign to launch the project, in addition to covering the costs of dissemination
2

Analyse

The design and budget of the cycling-infrastructure proposed by the SMM-GAMLP technical team and make recommendations for improvements and additions to optimise its operation and cost based on best international practices
3

Advising and partnering

For the technical team of SMM-GAMLP in the integrated planning of the Cycle-infrastructure Network for the Southern Macro District of the municipality of La Paz, Phase I (Calacoto and San Miguel areas) and during its construction

Latest related news

Image


Municipality of La Paz builds an emergent cycle path as a measure against COVID-19

July 22, 2020

The basis for planning was the EUROCLIMA+ project, since a section runs through the infrastructure to be built permanently.

Image


Opportunities for the bicycle during and after COVID-19

July 07, 2020

Several cities in Latin America and around the world are developing actions to promote urban cycling for essential travel.

Image


 
UThe European Union and AFD are supporting La Paz in implementing the first phase of the cycling path network

January 08, 2020

Under the framework of EUROCLIMA+, the entities signed the cooperation agreement with a budget of 500 thousand euros.

 

Tools and resources

Project poster


See more

Team

 

Ramiro Burgos          

Secretariat Municipal of mobility

Secretariat of Mobility

 
 

Ximena León 

Secretariat of Mobility

                                                      